General Description >
The Modified Heavy Mechanized Bridge is a set of equipment used for rapidly bridging over medium rivers with depth of water not more than 5.5m.The standard set consists of 5 vehicle- mounted spans with total bridge length 75m. The payload is 60T for track load and 13T for axle load. It is featured with high mobility, easy deployment and bridge-deck adjustment. The 50m bridge includes five spans and five layer trucks.
Specifications >












